Private beta
How PartPassport checks a data book, from PO to signature
One flow, six steps, the same for every company. The model reads the documents, plain code checks them against your verified limits, and a person signs.
Short answer
PartPassport, the data book verification tool for castings and forgings, works in six fixed steps: customer, requirements card, PO, documents, review and sign. Each value is read from its page, compared by plain code with a limit your team verified from its own licensed standard, and shown boxed on the page. A person makes every decision and signs the report.
What are the six steps?
The six steps are the same for every company and every order, so a reviewer always knows where a finding came from. Steps 1 to 3 set the rules for the order. Step 4 brings in the evidence. Steps 5 and 6 are where a person decides and signs. Nothing moves to the next step without a person confirming it.
Step 1: Customer
Choose the customer the order belongs to. The customer carries its requirements card, its index order and its history of past books, so the next order starts from what was already agreed.
Step 2: Requirements card
The customer's standing requirements, turned into one fixed, versioned card that a person confirms once. When the customer changes a requirement, the card gets a new version and older books keep the version they were checked against. See the definition below.
Step 3: PO
The purchase order is read twice, independently. Prices and commercial terms are dropped and never stored. On one screen, a person confirms the customer, each line, part number and revision, quantity, material and every clause. Certificate quantities are later checked against the PO quantities.
Step 4: Documents
Upload the whole package and say what each file is. Certificates and the source records behind them (spectrometer printouts, tensile and Charpy test reports) are read twice and checked. Furnace charts, RT, UT, MT and PT reports, hydrostatic test reports, dimensional reports, PMI reports and certificates of conformance are filed as received in the section you choose, counted against the evidence plan and confirmed by a person. Every file gets the package checks first: blank, duplicate and missing pages, and locked or unreadable files.
Step 5: Review
Every finding appears with its evidence boxed on the source page. A person accepts, rejects or annotates each one. Findings are sorted into four classes, described below. Values that could not be found, and grades your team has not verified yet, are listed here too: they never pass on their own.
Step 6: Sign
A person signs the verification report. The signed PDF carries a QR code that links to a verification page, so a buyer can check the report online. Then PartPassport assembles the data book: one bookmarked PDF with cover, contents, section dividers and page stamps placed so they never cover print. The priced PO is never included.
What is a requirements card?
A requirements card is one fixed, versioned record of a customer's standing requirements for castings or forgings, confirmed once by a person and applied to every order from that customer. It replaces re-reading the same quality clauses, specifications and index instructions on every PO.
| Field | Example of what goes in it |
|---|---|
| Material and certificate type | ASTM A216 WCB, EN 10204 3.1; or EN-GJS-400-18-LT, EN 10204 3.2 |
| Extra mechanical limits | Charpy impact at a stated test temperature, hardness range, beyond the base standard |
| Heat treatment | Required condition, furnace chart required per load |
| Tests per heat or per piece | RT, UT, MT, PT, hydrostatic test, PMI, with extent (per heat, per piece, percentage) |
| Documents and index order | The customer's section order for the book, document by document |
| Special clauses | Kept word for word and marked "confirm by hand" |
Special clauses that cannot be checked by code are never paraphrased. They stay in the customer's words, and a person ticks each one.
What happens before production?
The evidence plan opens when the PO is confirmed, before production starts. It lists the evidence each heat and each PO line will need, so nothing that can only be captured on the shop floor is lost by the time the book is compiled.
The data book index and the compliance matrix can be issued to the buyer for approval before production. The issued version is frozen, and the buyer's reply is recorded against it.
The evidence plan for foundries and forgesEN 10204 3.1 vs 3.2 for castings and forgingsHeat number traceability for castings
- Book the inspector for witnessed tests.
- Keep the Charpy bars with their heat treatment lot.
- Keep the furnace chart for every load.
What does a finding look like?
A finding is one statement about one value, with its evidence. It names the requirement, the value as read, where it was read (document, page, box), the verified limit it was compared with, and the result. The reviewer sees the source page beside the finding with the value outlined, so checking it takes seconds instead of a search.
| Rm MPa | Rp0.2 MPa | A % |
|---|---|---|
| 452 | 248p. 2, box B6 | 26 |
Which kinds of findings does the review show?
PartPassport sorts every finding into one of four classes, so a reviewer can see at a glance whether the problem is the order, the material, the chain of identity or the paperwork itself. The same four classes are used in the signed report.
| Class | What is checked | Example finding |
|---|---|---|
| Contract conformance | PO number and line, part number and revision, quantity, grade, EN 10204 type | Certificate states 3.1; PO line requires 3.2 |
| Standard conformance | Values against limits for the grade, edition, thickness band and test temperature | Charpy result reported at a warmer temperature than the card requires |
| Traceability | The same heat or serial on every document and on the part | Heat number on the tensile test report differs from the certificate |
| Formal validity and format | Signatures, stamps, issuer identity, legibility, missing pages, index, bookmarks, language | Page 4 of 6 missing from the heat treatment chart |
Are test reports checked, or only certificates?
Certificates and their source records are read and checked. Every other report is tracked, not read, today. Each NDT, hydrostatic test, dimensional and PMI requirement on the card becomes a row on the evidence plan, with its extent (per heat, per piece, by sample) and acceptance standard, and an item on the review that says plainly that PartPassport does not read these reports yet, with the filed report beside it for a person to check and confirm. The package checks still run on every file, so a chart with page 4 of 6 missing is a finding. Readers for NDT and test reports are next on the roadmap.
| Serial | Heat | Test pressure | Hold | Result |
|---|---|---|---|---|
| 001 | H24-0917 | 22.5 bar | 30 min | No leak |
| 004 | H24-0917 | 22.5 bar | 30 min | No leak |
| 005 | H24-0917 | 22.5 bar | 30 min | No leak |
| 007 | H24-0917 | 22.5 bar | 30 min | No leak |
What is Quick check?
Quick check is the short path through PartPassport for a package you need to look at today. It skips the customer, requirements card and PO steps. You upload the documents and get a report on package defects, values located on their pages and checks against your verified limits.
Use the full six steps when the book must meet a specific customer's requirements.
- No customer requirements are applied, because there is no requirements card.
- No signed verification report or assembled book.
- Files are deleted after 7 days.
Which design principles does PartPassport follow?
PartPassport follows seven design principles. They decide what the software is allowed to do on its own and what it must leave to a person, and they apply to every check in every step.
The model reads, code decides
A language model reads the documents; plain, testable code compares values with limits.
No evidence, no pass
A requirement without evidence on a page is open, not met.
Every value has an address
Document, page and box, so anyone can find it again.
Two readings for critical values
Critical values are read twice; if the readings differ, a person looks.
Unknown means stop
A value not found, or a grade not yet verified, goes to review.
Flag, don't accuse
Findings describe what the page shows. They do not judge the supplier.
The tool never approves
A person signs.
How is PartPassport tested?
Before each release, PartPassport runs a test gate of 45 synthetic golden cases containing 67 seeded defects. In the current gate, all 67 are caught with zero false flags. These are synthetic test cases built for the gate, not a measure of real-world accuracy, which the beta exists to establish.
How is PartPassport different from other certificate and data book tools?
PartPassport is built for castings and forgings and starts at the purchase order. Most tools in this space store certificates, read mill test reports for pipe, plate and bar, or assemble books and route them for review. Each of those is useful; none of them checks a casting or forging book against the order from the PO to a signed record.
| Kind of tool | Good at | Usually leaves to a person |
|---|---|---|
| Certificate storage and ERP gates | Filing certificates by heat, PO or job; recording that a certificate arrived | Reading the values and checking them against the order and the standard |
| AI mill test report readers | Reading wrought product certificates (pipe, plate, bar) against built-in rule sets | Cast grades, test bar types and thickness bands; the rest of the book; saying where the limits came from |
| Data book assemblers and document control | Indexes, transmittals, bookmarks and review routing | Checking the content of each document |
| PartPassport | An evidence plan at the PO, every value checked against your own verified limits and boxed on its page, the book assembled in the customer's index order | The decision and the signature, always |
What does PartPassport not do?
PartPassport checks documents. It does not replace the inspection, the inspector or the person who signs. These limits are part of the design, not gaps waiting to be filled.
- PartPassport never calls its report a 3.1 or 3.2 certificate, and it is not an authorized inspection representative.
- PartPassport checks documents against the order. It cannot tell whether the metal matches the paper, and reviewing paper cannot catch a well-made forgery. Keep doing PMI, hardness checks and heat number checks on the part; PartPassport says when they are the right next step.
- PartPassport never extracts or stores prices or commercial terms from a PO.
- Limits come only from your company's own licensed standards, never from memory or a language model.
- PartPassport does not approve anything. A person signs.
See it on your own orders
Design partners run PartPassport on real casting and forging orders and shape what it checks next.