Private beta: accepting design partners
For suppliers of castings and forgings
Data book software for foundries, forges and machine shops
Plan the evidence when the PO arrives, check every certificate against your own verified limits, file every report in its section, and send a book that has been checked against your customer's requirements before it leaves.
Short answer
PartPassport, the data book verification tool for castings and forgings, helps suppliers build a manufacturer's data book (MDB) that is ready for review. It opens an evidence plan at the PO, checks certificates and their source records against limits your team verified from its own licensed standards, files every other report in its section and lists what is still missing, and assembles the book in your customer's index order. A person on your team signs.
What does a rejected data book cost a supplier?
A rejected data book costs a supplier time, review cycles and cash. On EPC orders, retention of about 10% of PO value is typical for valves, pressure vessels and rotating equipment, released against conditions that include final documentation (Project Materials). Every resubmission keeps that money out of your account longer.
75%
of suppliers reported documentation-related payment holdbacks (DocBoss survey, 2016, 106 respondents; directional).
1 in 4
suppliers said most of their documents were approved on first submission (same survey).
30%
of suppliers list documentation as a line item on their proposals (DocBoss), so most of this work is unpriced.
Why data books get rejected, and how to catch each cause first
How do you plan data book evidence at the PO?
You plan data book evidence at the PO by listing, before production starts, every record each heat and each PO line will need. PartPassport builds that list from the requirements card and the confirmed PO, then turns it into a before-production checklist so evidence that only exists on the shop floor is captured in time.
The data book index and compliance matrix can be issued to your buyer for approval before production. The issued version is frozen and the buyer's reply is recorded, so the index you compile against is the one they agreed to.
Before production, for a typical pressure-retaining casting order
- Book the third-party inspector for witnessed tests (3.2 orders).
- Keep the Charpy bars with the heat treatment lot they represent.
- Keep the furnace chart for every heat treatment load.
- Record which test bars are cast-on and which are separately cast.
- Map every weld repair on the casting, if the order requires repair records.
- Confirm the per-piece tests: RT, UT, MT, PT, hydro, PMI.
What does the evidence plan look like?
The evidence plan is one table per order: each requirement from the card and the PO, the record that will prove it, whether it is needed per heat, per load or per piece, and its status. It covers every record the book will hold, from spectrometer printouts and furnace charts to UT, MT, hydrostatic test, dimensional and PMI reports, so the shop knows before the first pour what to keep and how many of each.
| Requirement | Evidence | Per | Status |
|---|---|---|---|
| Chemistry, grade per card | Spectrometer printout | Per heat | Planned |
| Tensile and Charpy at the card temperature | Test report, separately cast bars | Per heat and lot | Planned |
| Heat treatment condition | Furnace chart and load list | Per load | Planned |
| UT, extent per card | UT report with procedure | Per piece (8) | Planned |
| MT on machined surfaces | MT report | Per piece (8) | Planned |
| Hydrostatic test | Test report with pressure and hold time | Per piece (8) | Planned |
| Dimensions to drawing rev C | Dimensional report | Per piece (8) | Planned |
| PMI, 100% | PMI report | Per piece (8) | Planned |
| 3.2 witness of mechanical tests | Inspector booking and signed record | Per heat | Open: book inspector |
| Index and compliance matrix | Buyer approval, issue 1 | Per order | Issued, awaiting reply |
Scroll the table sideways for the status column
Before-production checklist
- Book the third-party inspector before mechanical tests are scheduled
- Mark test bars by heat and heat treatment lot; keep spares
- Save the furnace chart with a load list naming heats and serials
- Record cast-on or separately cast for each bar
- Confirm per-piece tests: UT, MT, hydro, dimensional, PMI on 8 pieces
How does PartPassport check against your limits?
PartPassport checks each value against limits your own team entered and verified from its own licensed standards. It ships 456 grade designations across ASTM, EN, DIN, ISO and JIS, with groups of comparable grades your customer chooses to accept, but it does not ship limit values. Until your team verifies a grade, its checks go to review, never to pass.
Enter limits your way
Read them from your licensed PDF, import an Excel workbook, or type them by hand. A person verifies each grade before it is used.
Limits by wall thickness
Many casting and forging standards change limits with section thickness. Limits are stored by thickness band and applied to the part's governing thickness.
Comparable grades, on your customer's terms
If a customer accepts EN-GJS-400-18-LT where the drawing calls for an ASTM grade, that acceptance lives on their requirements card, not in a general table.
How is a certificate checked against its source records?
PartPassport checks each certificate against the source records behind it, such as spectrometer printouts and tensile and Charpy test reports, at the precision printed on each record. If the certificate says 0.21% carbon and the spectrometer printout says 0.23%, that is a finding, with both values boxed on their pages.
| C | Mn | Si |
|---|---|---|
| 0.21p. 1, box A3 | 1.02 | 0.44 |
| C | Mn | Si |
|---|---|---|
| 0.23p. 6, box A2 | 1.02 | 0.44 |
How is the data book assembled?
PartPassport assembles the data book as one bookmarked PDF in your customer's index order, after a person signs the verification report. The book gets a cover, contents, section dividers and page stamps placed so they never cover print. The priced PO is never included.
Your customer's order, every time
The index order comes from the requirements card, so the second book for a customer looks like the first.
Stamps that never cover print
Page numbers and section stamps are placed so they never cover printed content on the original page.
Redaction that removes content
When a page must leave with content hidden, the content under each box is removed, not just covered. The copy is re-read and refused if any word remains.
Bookmarks, in Sample Valve Co. index order
- 1Cover and certificate of conformance1 to 2
- 2Index and compliance matrix3 to 5
- 3Purchase order, unpriced extract6
- 4Material certificates7 to 9
- 5Chemical analysis10
- 6Mechanical tests11 to 12
- 7Heat treatment charts13 to 18
- 8NDT: UT and MT19 to 30
- 9Pressure test31 to 32
- 10Dimensional reports33 to 35
- 11PMI36
- 12Verification report37 to 39
Assembly checks
What does a casting or forging data book need that a mill certificate does not?
A casting or forging data book needs evidence that a mill certificate for plate or pipe rarely carries: which test bars represent which castings, which heat treatment load each piece was in, where weld repairs were made, and per-piece NDT. PartPassport's requirements card and evidence plan are built around those records.
| Evidence | Why buyers ask for it | What PartPassport checks |
|---|---|---|
| Test bars (cast-on or separately cast) | Mechanical results must represent the heat and, where required, the heat treatment lot | Test bar type recorded; bar identity matches heat and lot on the certificate |
| Heat treatment lot and furnace chart | Properties depend on the load the piece was treated in | The certificate must reference a chart; the chart is filed per load and checked for missing pages |
| Charpy results for low temperature service | Toughness at the required test temperature, for example for ferritic ductile iron LT grades | Test temperature and values present and within verified limits |
| Weld repair records and maps | Major repairs can require records, maps and re-inspection | A review item where the card requires records; the map and repair NDT filed in the Weld repairs section |
| Per-piece NDT (RT, UT, MT, PT) | Extent is often per piece, not per heat | A plan row per test with its extent; the report filed in its section; a person confirms it covers every piece |
| Machine shop records | A machine shop that changes the part becomes responsible for its own records | Foundry certificate passed on unchanged; shop records added for its own work |
Heat number traceability for castingsHow to check a data book, step by step
Who on a supplier team uses PartPassport?
PartPassport is used by the people who already build and sign data books: the certification clerk who compiles them, the quality engineer who checks them, and the quality manager who signs. Each sees the same findings with the same evidence, so the check is done once.
Certification clerk
Uploads the package, fixes package defects, and assembles the book.
Quality engineer
Works through the findings with the evidence on screen and records each decision.
Quality manager
Signs the verification report and sends a book that can be checked by QR.
What should suppliers know before applying?
PartPassport checks your documents. It does not replace your inspection, your authorized inspection representative or your signature.
- PartPassport never calls its report a 3.1 or 3.2 certificate.
- PartPassport never extracts or stores prices or commercial terms from a PO.
- Limits come only from your company's own licensed standards.
Build your next data book with us
Design partners run PartPassport on real casting and forging orders. Tell us what you ship and how many books you build a month.